欧美A级毛欧美1级a大片欧_久久久久精品一区二区三区_欧美日韩国产一区二区三区播放_亚洲综合av一区二区三区

<ol id="18kp8"><tbody id="18kp8"></tbody></ol><var id="18kp8"></var>

Bookmark this site SitemapContact Yixin  中文

Welcome toAnqiu Yixin Machinery Co., Ltd.Official website!

Yixin Machinery

Anqiu Yixin Machinery Co., Ltd.Constantly innovating and committed toproduct development, update and improvement

Service Line:15866407777

Popular Keywords: S-L separation KuangShanXiXuan
Current Position Index > 新聞中心> Briefly describe the installation operation of the drum vacu

Briefly describe the installation operation of the drum vacu

Pageviews:1406?? Release Date:2021-07-31

(1) Level the rack, frame and frame at the same time, place the rack in place, and connect the racks according to the instructions in the manual. After the level is corrected, the rack should be securely fastened.

 

(2) The tape roller, the roller supporting the tape is fixed on the frame, and after leveling, the rubber filter tape is spread on the roller. The driving roller and the driven roller are hoisted to the middle, that is, the middle of the rubber filter, and then moved to the two ends, respectively, and the bracket and the bearing seat are installed.

 

(3) Assembling and seating the vacuum box components, connecting the vacuum boxes in sequence, and aligning them with the small rollers, the lifting mechanism, the winch frame, etc., and tightening the frame and the frame with bolts. .

 

(4) Install the feeding device, the washing device small roller, the filter cloth tensioning device, the filter cloth adjusting device, and the scraping device.

 

(5) Install the connecting hose, and require tight connection without leakage.

 

(6) Drive the device, position the drive frame, install the reducer and the coupling, and ensure the coaxiality between the drive roller and the motor shaft.

 

(7) The pneumatic system, air control and deflection cylinder are connected by high pressure hose.

 

(8) Piping system, joint feeding, washing, cleaning and vacuum system piping.

 

(9) Electronic control system, connecting electric control cabinet and drive motor, gas control cabinet, joint and pipeline valve.

 

(10) Filter cloth, place the gravity roller of the filter cloth in the loosest position of the filter cloth, find the arrow of the movement direction of the filter cloth, and then pass the filter cloth through the feeding box, the washing box, the driving roller, the filter cloth gravity and the deviation Roller, roller, etc., flatten it, butt the two ends of the filter cloth and thread the wire. Check the flushing line before installing the filter cloth to ensure that all nozzles can flush the net filter cloth.

 

上一篇:沒有了

下一篇:Safety requirements for vacuum drum filters

  • TELTEL15866407777
  • ContactContactManager Hao
  • 郵箱郵箱
  • Company AddressCompany AddressMinghu North Road, Anqiu Economic Development Zone, Weifang City, Shandong Province
Anqiu Yixin Machinery Co., Ltd. 備案號:魯ICP備19026764號-1   
台山市| 拜泉县| 延寿县| 磐石市| 东丰县| 高邮市| 喜德县| 肇庆市| 舟山市| 宣威市| 茶陵县| 锡林郭勒盟| 波密县| 奇台县| 新晃| 滕州市| 岢岚县| 宁夏| 江津市| 邢台县| 博客| 岳阳市| 德阳市| 鞍山市| 凤台县| 青川县| 玉林市| 高雄市| 邹平县| 九江市| 孝昌县| 鹤岗市| 延津县| 太白县| 阿拉善左旗| 获嘉县| 个旧市| 祁连县| 炎陵县| 新源县| 诸城市|